ABRO

SECTOR — PORT

In a port, seconds carry weight.

A wide site, uninterrupted shifts and restricted access corridors. The moment a case opens, the crew on shift moves with the right information, and treatment and handover are recorded.

  • 24/7 SHIFTS
  • ON-SITE TREATMENT
  • QR BAG COUNTS

DAILY FLOW

A case opened at the quay, a handover closed at shift end.

Every action on site accumulates with a timestamp; who took over and when is documented.

  1. 00:00

    The case opens at the quay

    Reason for the call and location go into the record; the crew on shift sees it without delay.

  2. 00:01

    The crew on shift is assigned

    The team and vehicle on duty at that hour are already in the system, so assignment takes seconds.

  3. 00:20

    Treatment and outcome

    The procedure, the consumables used and the outcome — treated on site or transported to hospital — go into the same form.

  4. SHIFT END

    The handover closes with proof

    Bag counts are done by QR; anything missing shows up before handover, and the shift closes with a photo.

PORT-01

Mobile QR bag count and shift handover screenREAL SCREENSHOT COMING SOON

KEY MODULES

Three pillars of an uninterrupted site.

All six modules are available; in a port, cases, stock and shifts lock into each other.

  • VKA

    Case Management

    The case is opened on site; treatment, outcome and timings build up in one form, and the official output is one click away.

    VIEW MODULE
  • STK

    Stock & Medication Management

    Ambulance and treatment-room inventory is tracked down to bag and compartment level; a QR count takes minutes.

    VIEW MODULE
  • VRD

    Shift Planning

    Continuous schedules are generated automatically; shifts start with QR and a photo, and the handover stays on record.

    VIEW MODULE

DEMO

Bring your port site into one system.

Tell us how many points and shifts you run; we will set up your field flow in a demo environment.

Request a Demo
KVKK COMPLIANTQR COUNTSMOBILE FIELD USE